Center Street Wastewater Treatment Plant Capacity Enhancement Project
Center Street Wastewater Treatment Plant Capacity Enhancement Project
The Center Street Wastewater Treatment Plant (CSWWTP) was constructed in 1969 and in 1986 it was upgraded and expanded to its current capacity of 3.7 million gallons per day (mgd). Due to the age and condition of the existing equipment, the $27.3 million capacity enhancement project, will upgrade the CSWWTP to meet more stringent discharge limits while achieving a 20% reduction in energy consumption by replacing outdated equipment and processes. Construction will last through spring of 2015.
If you are interested in receiving periodic updates on the CSWWTP project over the next 2 years, please email us at centerstreetwwplant@mpwonline.com and you will be added to our email updates.
Be sure and check back periodically for updates on construction activities.
Construction Activities for the Month of June 2013
- Ongoing rebar deliveries
- Concrete pour the blower building suspended slab
- Concrete reinforced pile deliveries
- Pile driving at the Distribution Box No. 1
Special Construction Activities June through September 2013
- Late night and early morning concrete pours. Click here for proposed schedule. This schedule is subject to change based on weather conditions.
This is necessary for concrete being poured for tanks that will hold liquid if the temperature exceeds 85 degrees